May 23, 2025

TOEL @ Emerald Island ~ Final Survey

FINAL INSPECTION (After)
TOEL - Touch of Eden Landscape
Boulder Retaining Wall, Keystone Steps,
Perimeter Landscaping, Flagstone, 
Dry-Creek Beds w/ Culvert Drain System.
Final Soil, Seed, Straw - Establish Slope & Lawn

vp 360 Survey

MIDWAY FLIGHT

ORIGINAL PRE-FLIGHT (BEFORE)
~
Drone & Draft Phases

Final Draft Phase

May 19, 2025

TOEL | CATCHMENTs & Dry River Bed

 Inspection A | TOP~TO~BOTTOM

VP Drone & Design
Working with Enviromental Services & TOEL
to develop water-run-off mitigation.
Resolution Dry-River-Bed Catchment Systems

 Inspection BBOTTOM~TO~TOP

TOEL - Touch of Eden Landscape

vp 360 Survey