October 15, 2024

TOEL @ Irrigation Drone, Design & Map

Touch of Eden Landscaping (TOEL)
VANTAGE POINT Drone & Design | VP 360
Lake Belle Taine, Nevis (Higgins Project)
(Just about to wrap up this project...) 
One of the Final Landscaping Steps is to install Irrigation.
VP | 360 Drone, Design & Map the Install,
We lamenate the Zone Info for Future Access & Maintenance.

This particular install required that we lay 4 culverts underground
in collaberation with other construction crews.
These Culverts needed to be in place before Concrete & Blacktop installs.
This allows us to gain access to landscape islands & areas that will be cut off.

Here are additonal examples of Irrigation Installs from this fall.

VP | 360